Built for every rolein the AEC chain.
Owners, contractors, estimators and design teams receive role-specific outputs from the same connected engineering state.
Beyond Images — Executable Numbers
A digital twin where engineering numbers and physical reality match 1:1.
From Drawing to Connected Engineering Data
Drawings, project requirements and constraints enter a connected production workflow where engineering logic, deterministic calculation and trained Metomers build and verify BIM, quantity, cost and schedule information in parallel. Targeting approximately 2–5× faster connected engineering delivery under comparable scope and input conditions.
Machine-Readable Data (LOD 400 class)
Where the agreed scope requires it, LOD 400-class information supports fabrication, assembly and installation decisions. LOD describes how developed and reliable the model information is for its intended use—not how photorealistic it looks.
xD BIM vs. Traditional Workflow
Connected change without rebuilding every output
Traditional—Data Breaks at Every Stage
Result: Data breaks at every handoff. Manual re-entry at each stage. Errors multiply.
METOMOS—Connected Recalculation
Verified change, affected outputs recalculated
A verified change is traced to the quantities, model views, costs and schedule states it affects; those outputs can then be recalculated for review.
Edit one value.
A verified change can be traced to the quantities, model views, costs and schedule states it affects. Those outputs are recalculated through their existing relationships, with exceptions left visible for review.
They build a living, 3D price tag for a building.
A cost estimating office takes a drawing and answers one question, over and over, for every wall, beam, and finish: how much does this cost, and how much material does it take?
METOMOS turns that answer into something you can see and verify — a 3D model where every element is already priced, quantified, and traceable back to the drawing it came from.
Traditional estimate
METOMOS living price tag
Format
Static spreadsheet
3D model + linked numbers
Traceability
Hard to verify by eye
Click any element to see its cost
When design changes
Re-count by hand
Affected values can be recalculated
Every building owner asks the same question: where is my money going, and why does it cost this much?
A conventional estimate may be correct when it is issued and still become difficult to trust after the design changes. If quantities, rates, model objects and approvals live in separate files, the team must reconstruct which cost still belongs to which part of the current design.
A connected, verifiable 3D price tag keeps the model, quantities and cost basis close enough to review together—before a mismatch becomes a site problem.
Solutions
Built for every role in the AEC chain.
The Challenge
Early feasibility decisions must often be made before design information is complete, so assumptions and uncertainty need to remain visible.
METOMOS Solution
Provide the available site plan, concept material and project assumptions. METOMOS develops a preliminary BIM, quantity and cost package within an agreed scope and review standard.
Key Benefit
Compare investment options using a traceable preliminary engineering basis.
Developers workflow
Demonstration available on request